Direct answer
Your Distribution Network Service Provider can cap how many kilowatts you export. That cap is a connection condition, not a product fault. It is commissioned into the inverter. A quote that assumes unlimited export on a constrained feeder is incomplete.
The parent page is how solar works. We will not invent the cap for your street.
Who the DNSP is
In New South Wales: Ausgrid, Endeavour Energy, or Essential Energy. In Queensland: Energex or Ergon. In Victoria: CitiPower, Powercor, United Energy, Jemena, or AusNet. In South Australia: SA Power Networks. In Western Australia’s south-west: Western Power. Tasmania: TasNetworks. ACT: Evoenergy. Northern Territory: Power and Water.
Those businesses publish connection information that changes as suburbs fill with rooftop PV. South Australian feeders taught the country this lesson early; urban networks elsewhere have been catching up.
Why it shows up on the quote
The designer should say what they assumed and who lodges the application. Dynamic or flexible export arrangements exist in some networks — they are not a slogan you should accept without the DNSP’s words. See inverters for how the box is commissioned, and installers for who owns that paperwork.
If the cap is tight, sizing for a lunchtime export credit is a weaker reason than covering daytime load. See cost of solar and east-west versus north.
What this is not
An export limit is not an STC. It is not a feed-in tariff. It is not a reason to skip CEC listing. It is not proof the inverter is “undersized.” Read STC vs state rebates if a salesperson is mixing money lines.
We will not publish a map of “good postcodes.” Ask the installer to show the application.
Related: string vs micro vs hybrid, resources. Last reviewed 25 September 2026.
Ask for the application
The designer should say what they assumed and who lodges the DNSP paperwork. Dynamic export is a network product, not a slogan. Sizing for lunchtime export on a tight cap is a weak reason. See how solar works, inverters, cost, and installers.
The cap is commissioned
Ask what the quote assumed and who lodges the DNSP application. The inverter is set to the rule. Unlimited export on a constrained feeder is an incomplete quote.
Carry this into the quote meeting
Name the DNSP. Ask what the quote assumed. The cap is commissioned into the inverter. Unlimited export is not a default.
Parent hubs and siblings are linked above. Last reviewed 25 September 2026. General information only.
More from the journal
- How to compare two solar quotes fairly →
Line up kilowatts, models, mounting, inclusions, and STC treatment. A cheaper net price with thinner paper is a different job, not a saving.
- East-west vs north-facing roof: which is better? →
A clear northerly pitch still maximises annual energy in most of Australia. East-west can match morning and afternoon loads better. Shade beats both arguments.